How is Green different from Yellow?
A. Greens lead scoped DMAIC and own Measure/Analyze rigor; Yellows primarily support.
← Home · Lean Six Sigma hub · Factory-training library
Own a scoped DMAIC project end-to-end: charter, MSA, capability, verified root causes, pilots, and Control handoff with standard work / Job Instruction — with Black Belt coaching on advanced DOE.
Green Belt leads a scoped improvement — often part-time. You run full DMAIC with tollgates, select tools appropriately, lead Yellow Belts/SMEs, and hand off a controlled process with updated standards and JI.
Depth: MSA/Gage R&R intro, process capability (Cp/Cpk), control charts, basic hypothesis tests & regression orientation, FMEA, VSM, pull, standard work, A3. Full multi-factor DOE and advanced regression are escalate to Black Belt.
Factory / Toyota training context: Green Belts turn kaizen energy into chartered projects — then use TWI Job Instruction so the new method sticks across shifts.
Material + information flow, inventory, C/T, C/O, uptime, lead vs process time. Future state with pull/WIP limits and kaizen bursts.
Withdrawal and production signals; WIP limits; connect to takt. Move from push batches toward pull.
Sequence, timing, SWIP, key points. Hand off a Job Breakdown so instructors use Prepare–Present–Try out–Follow up.
One-page story: background, current, goal, analysis, countermeasures, plan, follow-up.
Internal vs external setup; convert and streamline. Green often leads changeover kaizen with coaching.
Flow to takt; stop-and-fix with andon; level mix awareness; autonomous care partnership.
Charter, SIPOC, VOC→CTQ, stakeholder map, scope.
Operational definitions, data plan, MSA intro, baseline, stratification.
Graphical tools, basic hypothesis tests, verified root cause (not fishbone-only).
Pilots, FMEA, poka-yoke; DOE awareness — escalate complex X interactions.
Control plan, charts, standard work / JI, reaction plan, audit, handoff.
Repeatability, reproducibility; attribute agreement. Fix the gage before chasing process X’s.
I-MR, X̄-R/S. Stable first, then Cp/Cpk vs specs. Know Cp vs Cpk (centering).
t-tests, proportions, simple ANOVA awareness; simple regression orientation. Practical + statistical significance.
Severity × Occurrence × Detection → prioritize actions before launch and after redesign.
Phase-by-phase tool map for DMAIC projects.
Special vs common cause; SPC chart fundamentals.
Failure Mode and Effects Analysis structure.
VSM overview for current/future state design.
Cp/Cpk concepts and interpretation caveats.
SPC system view beyond a single chart type.
RCA framing that pairs with 5 Whys and verification.
BoK target for Green Belt project leaders.
Independent BoK framing DMAIC competencies for Y/G/B.
Exam-based Green Belt competency framing.
Free university course materials covering Lean and Six Sigma methods.
U.S. MEP lean services: VSM, 5S, changeover, continuous improvement for manufacturers.
Government primer on TWI and Job Instruction for manufacturers.
Authoritative VSM definition and current/future-state intent.
A3 problem-solving story format.
Rapid changeover method lexicon.
Standardized work as the baseline for kaizen.
Links Lean waste reduction to environmental outcomes.
Free self-study manuals by belt (some fetchers see 403; page is the known free-manual hub).
Principles-based operational excellence model (culture + systems + tools).
Gage R&R primer for MSA — trust the measurement system before Analyze.
Quality statistics overview useful for Green/Black analytical depth.
A. Greens lead scoped DMAIC and own Measure/Analyze rigor; Yellows primarily support.
A. A phase-exit review with evidence that exit criteria are met before the next phase.
A. Noisy gages make you ‘improve’ measurement noise instead of the process.
A. Stability = predictable common-cause variation. Capability = does that stable process fit specs?
A. Cp is potential if centered; Cpk penalizes off-center location vs the nearer spec.
A. To confirm a suspected difference with data — weigh practical significance, not p-values alone.
A. Scatter/simple models for Y = f(X); don’t overfit. Multi-factor optimization → Black Belt.
A. Interactions, fractional confounding, response surfaces, or high experimental risk/cost.
A. What/how often/who reacts, reaction rules, where standards/JI live, audit cadence.
A. Update Job Breakdown and train with Prepare–Present–Try out–Follow up across shifts.
A. Prioritize failure modes before launch and after redesign — drive actions, not score theater.
A. Material + info flow, inventories, C/T, C/O, uptime, lead vs process time, then future state.